Our mission is to deliver innovative solutions that.
Tec ready to use floor patch instructions.
Avoid breathing dust and contact with eyes and skin.
Printable view go back.
Ready to use skimcoat patch is a water based product that is intended to repair minor imperfections to the substrate prior to the installation of the floor covering.
Best to keep from freezing.
View product details click the plus sign to add a pdf to my submittal.
Instructions for mixing mix only as much tec skill set skimcoat and patch as can be used in 10 15 minutes.
They provide strong resilient bonds on many substrates and come in a variety of formulas to meet your job s demands.
What are the substrate preparation instructions for tec ready to use skimcoat patch ta 896.
View tec s download section to find product data sheets safety data sheets warranty information technical bulletins specifications installation guides sell sheets and catalogs.
It can be used to fill small voids up to 6 mm deep per application such as knot holes nail marks on the floor nonmoving cracks seams and joints.
Tec offers ready to use floor and wall mastic adhesives that are designed to meet the needs of a wide variety of projects.
Tec turns visions into reality with tile adhesives and other flooring.
Ready to use skimcoat patch is a water based product that is intended to repair minor imperfections to the substrate prior to the installation of the floor covering.
For over 60 years tec has been a leading brand of high quality technologically advanced products for the installation and surface preparation of tile stone carpet wood and resilient floor coverings.
What are the substrate preparation instructions for tec ready to use skimcoat patch ta 896.
Tec products are developed and manufactured in the u s.
Tec ready to use skimcoat patch 896 description physical state paste color off white pot life 10 15 minutes dry time 1 16 1 6 mm let dry minimum 1 2 hours 1 8 3 mm let dry minimum 2 3 hours 1 4 6 mm let dry minimum 3 4 hours storage store in a cool dry place with lid tightly closed.
For best results maintain all tiling materials substrates room and adhesives at 50º 70ºf 10 21ºc for 24 hours before and 48 hours after installation.